Network Computing is part of the Informa Tech Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

EMC, Cisco Do the Deed: Page 3 of 3

But why did it take practically nine months for EMC to put the MDS switches through their paces? EMC is very careful. Goulden maintains that the certification timeframe is "fairly typical for a new product," adding that EMC has been pleased with how the MDS 9000 has performed in the lab.

Cisco, meanwhile, says there were only minor fixes necessary in the MDS 9000 switches to pass EMC's certification. "There was a misspelling in the CLI [command line interface]," says Cafiero by way of example. [Ed. note: If the misspelling was "Clariion," we can fully sympathize.]

Todd Spangler, US Editor, Byte and Switch