Network Computing is part of the Informa Tech Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Outsource Hardware Monitoring: Page 4 of 5

After the scanning, a summary report lists the number of vulnerabilities and patches to be addressed for each individual asset. Within the reports, you can drill down to a detailed description and a fix.

The patch report lets you view Microsoft's bulletin and download the appropriate patch locally; deploying patches to remote servers is up to you. Datacenter offers no way to skip certain patches or vulnerabilities.

Scheduling Reports

New to v.3.8 is the ability to schedule reports from any section. Select the Schedule Report icon, choose the granularity and set a schedule. Seven canned monthly reports cover areas such as network and system performance. Each report can be changed to fit your scheduling needs.

Once the report has run, you can view it from within Datacenter or add a bookmark to the latest report run in IE.