Network Computing is part of the Informa Tech Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

The Move From Physical To Virtual

airplane art
Layer By Layer
Here's how Transplace uses virtualization at different points in its infrastructure
The Database Layer

IBM p570 servers using IBM Power6 processors let Transplace deploy fewer but faster processors

The Application Layer

VMware's VMotion capability lets Transplace create a cluster of three or four severs to which it can add 20 to 40 virtual servers

Storage

Virtualized Network Appliance devices provide classic enterprise shared storage

Our decision last May to transform Transplace's computer network architecture from a physical to a virtual environment wasn't one-dimensional. It came in conjunction with our plans to move our production environment to a co-location facility; it was also time to refresh our server hardware.


InformationWeek Reports

Because we deliver services via the software-as-a-service model, we needed to maintain our 24/7 functionality, hosting, availability, reliability, and scalability. We also wanted to maintain our reliable disaster recovery process while adding flexibility to deploy multiple environments, including test and development, sales demos, and load-testing environments. We determined that a VMware virtual infrastructure would provide us with all of these attributes at a more reasonable cost than a new physical infrastructure.

We first thought of virtualization when considering a tiered storage strategy and a disaster recovery plan across multiple environments. We determined virtualization would help us move data quickly to the right storage source depending on our needs. We also realized virtualization would make it easier to deploy redundancy in our production environment, along with providing the horsepower to run disaster recovery and other environments.

Licensing costs were a critical factor when creating our near-real-time disaster recovery center. When a near-real-time data copy is used in disaster recovery, Oracle requires the same licensing model on both sides. We discovered that IBM p570 servers using IBM Power6 processors at the database layer would let us deploy fewer but faster processors. This let us further lower our Oracle licensing costs. The IBM p570 servers have logical partitions for which we can allocate as much memory and CPU power as we want, and we can share excess capacity across the partitions. By virtualizing the logical partitions, we can scale easier. And with the databases on shared storage, we can create extra partitions for our other production server to failover to, if necessary.

  • 1